Wall Frames Arrive
Starting with the amazing news that the wall frames have arrived on site.
Having a Hiab to unload the frames is way easier than the last time we built when we had to unload all the frames by hand.
Shed Progress
Moving on to part two, much of the work this week has been focused on building the shed. Progress has been steady with the bulk of the structure up and roof sheeting started (suspended on Wednesday due to high winds). Sunday was a family affair with everyone chipping in to help sheet the walls until the temperatures reached 37 degrees and forced us off the job. No point giving everyone heat stroke.
A big shout out to Kim and Pete (Brett's sister and brother in law) for the use of their cordless drill set. The thing is a beast and Brett is off to the tool shop on Monday to buy one.
No comments:
Post a Comment