Follow our journey as we build our forever house for us, our 3 sons, dogs, chickens and Nan

Monday, 2 March 2015

Plasterboard install, Day 3 of 9


The big plasterboard push is on.  We are at day 3 of a 9 day contiguous run to install as much plasterboard as 2 people can possibly do.  A picture tells a thousand words so here is some pictures. We are still dealing with the  way the sheets were stacked on delivery.  Invariably the sheets we need are always on the bottom so we are throwing up panels all over the house in a rather random fashion. Ultimately there is a plan (get it all off the floor and onto walls and ceilings) but at the moment it might not look like it.

 T's Room
 Ceiling
Nan's Bedroom ceiling was the first ceiling sheets to go in.  Time to reacquaint ourselves with the panel lifter
 J Bedroom completed
J's bedroom was probably the most awkward due to the lack of easy access.  Sheets couldn't come in through the door due to the passage so had to come in via the wall frame or window.
 Window pre cut out
 Cutting out the window
trimming the door