Another massive effort means that at least 80% of the walls have plasterboard on them. The only walls without plasterboard are still waiting for plumbing. Work continues on installing ceilings. We have 15 days to have the plasterboard installed and all the flushing completed (covering all the joints with plaster) and all the cornices in and ceilings painted.
The electircal run from the meterbox to the house and across to the shed is complete and we now have live power to some power points in the house and shed.