Follow our journey as we build our forever house for us, our 3 sons, dogs, chickens and Nan

Tuesday, 2 June 2015

End of the cornice

All the cornice is up (barring the en-suite that will have to wait)  We have now moved the excess cornice out of our lounge room and it looks like a lounge room again.


Before
 After

Installing the new pump

We installed the new pump Saturday afternoon.  It died Monday night.  Not happy Jan.  Back to running off the el-cheapo bunnings pump until the new pump comes back from the repair shop.  We altered the plumbing so we can switch between the 2 tanks by connecting the cheap pump to the small tank. We did this so we flick a couple of valves and pump water from the small tank back into the big tank.  Thankfully we got rain in the night so we have some water in the small tank again as we pumped most of the water across to the big tank Monday afternoon.


No comments:

Post a Comment